So Verizon has been in my building installing so I checked the staircases to see if I could find any improvement and I guess I did. The techs left a mdu box unlocked and I opened it up to see if they had begun wiring and this is what I found? How long will it usually take to wire a building with 17 floors? And what's going on here in this box! Thanks
↧